Northern side
The seating section that you can make out at the top of the steel framing is only the club seats. They still have to get the framing for all the suites/boxes above that, and then on top of those is the big section of general admission seating. So they have quite a long ways to go. Then they have to build stairs and ramps and all of the interior workings that make those areas accessible to 5-6,000 people on a gameday, bathrooms, concessions, etc etc etc. It just isn't happening - not even close.sooooo..... What's the reason that they can't open those seats up this fall?.... Looks like they could be done putting in those seats and having them ready for this fall if they wanted to...
Honestly, Even though they have made a TON of progress, they are just now framing the floor of the 6th floor... they have to finish that frame and then add 2 more floors above that and then add the regular seating above that. They have a lot more work to do than meets the eye... so they will be ready just in time for 2013 with all they have left to do.The seating section that you can make out at the top of the steel framing is only the club seats. They still have to get the framing for all the suites/boxes above that, and then on top of those is the big section of general admission seating. So they have quite a long ways to go. Then they have to build stairs and ramps and all of the interior workings that make those areas accessible to 5-6,000 people on a gameday, bathrooms, concessions, etc etc etc. It just isn't happening - not even close.sooooo..... What's the reason that they can't open those seats up this fall?.... Looks like they could be done putting in those seats and having them ready for this fall if they wanted to...
To put it in picture terms the red line is the flooring being worked on and the green is the hight of the bars put in placeCheck it out... Right now, they have are putting the top framing on the 5th floor/bottom framing on the 6th floor. If you look at the picture below, the red brick part of the building has been framed. The yellow facade on the northern end is shaping into the very top floor of the brick section below in which you see the little square windows. We are just now moving up to the white part of the building, and are just now placing the floor for the 6th story, which on the photo below is located just below the red "N" on the ends of the building... thus, we're about half way as tall as it's going to be once it's all finished.