AWWWWWW YEAH!MISTER Accountability has you covered:Please put in some speakers in South stadium soon
please?
Mr. Accountability said:Had the associate AD on sports nightly last night and did in fact state that now that the east stadium expansion is all but complete, they are beginning research on the new acoustics for an upgraded sound system. Said it's been in the works for a while, but with the dramatic change in structure, they really had no choice but to wait until it was completed. I think he said to expect an announcement following this season?
In other news-there is a god.
no one school should have all this awesome
You know you want to stay!Seriously bummed I won't get to see the inside of this in action any time soon.
You know you want to stay!Seriously bummed I won't get to see the inside of this in action any time soon.
Shoot...You know you want to stay!Seriously bummed I won't get to see the inside of this in action any time soon.
I was thinking about it until you took that out of context![]()
Most of the Rail Yard bars and restaurants won't be open until mid-late September. I can't believe they hacked and couldn't get those places open for the first game. They have to be missing out on so much revenue by not being open for the beginning of school and the first football game.With only 20 some days left, there still is a lot of work left. Do we have enough time to get the Rail Yard done or even the ribbon band up in Memorial done before the first game? The second apartment complex doesn't look like it will be finished in time.
Well that's disappointing. My dad really wanted to see it all in our first game.Most of the Rail Yard bars and restaurants won't be open until mid-late September. I can't believe they hacked and couldn't get those places open for the first game. They have to be missing out on so much revenue by not being open for the beginning of school and the first football game.With only 20 some days left, there still is a lot of work left. Do we have enough time to get the Rail Yard done or even the ribbon band up in Memorial done before the first game? The second apartment complex doesn't look like it will be finished in time.
There should be a fair amount of places open for the first game, here is a link for a timeline on everything:Well that's disappointing. My dad really wanted to see it all in our first game.Most of the Rail Yard bars and restaurants won't be open until mid-late September. I can't believe they hacked and couldn't get those places open for the first game. They have to be missing out on so much revenue by not being open for the beginning of school and the first football game.With only 20 some days left, there still is a lot of work left. Do we have enough time to get the Rail Yard done or even the ribbon band up in Memorial done before the first game? The second apartment complex doesn't look like it will be finished in time.
RESTAURANTS
Barry's (235 N. Ninth): Open
Buffalo Wings and Rings (Railyard, 300 Canopy St.): Aug. 28
El Mariachi Taco Cantina (Canopy Street Lofts, 601 R St.): Late September
Gate 25 (Railyard, 300 Canopy St.): Early September
Hiro 88 (Canopy Street Lofts): Aug. 25
Jack&June (Railyard, 300 Canopy St.): Mid-September
Jimmy John’s (Canopy Street Lofts, 601 R St.): Late August
Leadbelly (301 N. Eighth St.): Open
Mellow Mushroom Pizza (Canopy Street Lofts, 601 R St.): Late August
Rodizio Grill (151 N. Eighth St.): Late August
Unconfirmed/rumored locations
Greenfield's Cafe (Hilton Garden Inn, 801 R St.)
Twin Peaks (Tool House, 800 Q St.)
Unannounced pizza place (old Salvation Army building, 151 S. Eighth)
BARS
10 Below (235 N. Ninth St.): Open
Joysticks Arcade Bar (Railyard, 300 Canopy St.): Sept. 28
The Cask (728 Q St.): Open
Sweep Left (815 O St.): Aug. 12
Vega (Railyard, 300 Canopy St.): Late September
RETAIL
Breezy Island Ice (Railyard, 300 Canopy St.): September
The Doughnut Hole (Railyard, 300 Canopy St.): September
KD Designs (Railyard, 300 Canopy St.): Late September
Maize Popcorn Co. (Railyard, 300 Canopy St.): September
The Normandy (Railyard, 300 Canopy St.): September
Oliverde (201 N. Seventh St.): Open
Sanders Specialty Meats (Railyard, 300 Canopy St.): September
HOTELS
Courtyard Marriott (808 R St.): Open
Hilton Garden Inn (801 R St.): Sept. 5
Hyatt Place (Canopy and Q streets): February
RESIDENTIAL
Canopy Lofts (601 R St.): August
Hobson Place (Canopy and Q streets): February
OFFICE
Olsson Associates (Canopy and P streets): August 2014
ARENA
Pinnacle Bank Arena: Aug. 17 (UNL Graduation)
INFRASTRUCTURE
Pinnacle Arena Drive: Thursday (south of arena), Aug. 14 (north of arena)
R Street extension: Thursday
Q Street extension: Aug. 12
P Street extension: July 2014
Canopy Street: Aug. 12
Event parking lot (near Haymarket Park): Aug. 31
VIP Parking Garage: Aug. 16
Red 1 Parking Garage: Thursday
Green 2 Parking Garage: Fall 2014
Blue 3 Parking Garage: Summer 2014
Lumberworks Garage (711 O St.): Late November
Breslow Ice Center: Fall 2014
Pedestrian bridge: Fall
Amtrak Station: Open
District Energy Corp.: Operating
Thanks for the list of updates, Watson. I am not local, but I know a lot of people are interested in what's going to be open for the first game. I still can't believe that there will be places that aren't open for the start of school and the first football game. That is a HUGE mistake.