Mavric Posted May 12, 2013 Share Posted May 12, 2013 According to Eichorst (via LJS) there is a waiting list of 2,000 people for volleyball tickets. Sounds like the sellout streak will be safe for some time. Quote Link to comment
choyeskilm Posted May 30, 2013 Share Posted May 30, 2013 How are things going at Devaney? Anyone have any updates or photos? Quote Link to comment
TonyStalloni Posted June 1, 2013 Share Posted June 1, 2013 I'm wondering if the 2000 person waiting list is from the old venue and will be filled by moving to Devaney or if there is a 2000 person waiting list at Devaney? If so why not expand now? Quote Link to comment
HuskerNation03 Posted June 19, 2013 Share Posted June 19, 2013 Anybody got any updates on how the progress is coming in and outside the Bob? Quote Link to comment
TAKODA Posted June 24, 2013 Share Posted June 24, 2013 Just for reference, this is what it is supposed to look like. Nice! Quote Link to comment
MoStateHusker Posted July 7, 2013 Share Posted July 7, 2013 Here are some shots I took today of the devaney center renovations. First 3 are on the south side. Last one is on the west side. 3 Quote Link to comment
knapplc Posted July 7, 2013 Author Share Posted July 7, 2013 There isn't much to see here, unfortunately. Almost all of the work is internal, with the exception of the south facade: 1 Quote Link to comment
knapplc Posted July 7, 2013 Author Share Posted July 7, 2013 Here are some shots of the Innovation Campus work. First, the controversial Industrial Arts Building, which was originally slated for demolition but which is now being refurbished after preservation groups worked with the University. This is a view from the north, from the race track parking lot, looking south across what used to be the State Fair Midway. 1 Quote Link to comment
knapplc Posted July 7, 2013 Author Share Posted July 7, 2013 The interesting thing about that last shot is, you can see all the earth that's been moved to prep for the new streets. As you may remember, if you've been to the Nebraska State Fair back in the day, the main Fair entrance came in from the west, went past the north face of the Devaney Center, then jogged north and then back east. The Chautauqua pavilion was there where the road turned east again (right next to what is now the ice arena where the Stars play). Well, they're changing that road. Instead of jogging north, you're going to go straight east from the main entrance, cutting through what was the old hill, which they've now dug down into a sloped roadway. It's actually kinda groovy looking, even in the initial stages: This is from the top of that old little hill road, just as you were emerging onto the Midway, with the food buildings to your right and the race track to your left. The building in this pic is the 4H building, which also being renovated for Innovation Campus: Same spot as the previous pic, looking west toward Devaney: The main road, closer to the 4H building. This is the same spot from which I took the Industrial Arts Building pic in the previous post: 1 Quote Link to comment
Omaha-Husker Posted July 7, 2013 Share Posted July 7, 2013 Innovation Campus is a game changer for UNL, that is going to be a cool area of the city to watch progress. Quote Link to comment
TAKODA Posted July 8, 2013 Share Posted July 8, 2013 Thanks MoState and Knapp! Great to see the different views from all directions as to what they are changing. Like Omaha Husker said, this area could be sweet in the next few years. Quote Link to comment
kchusker_chris Posted July 11, 2013 Share Posted July 11, 2013 Here are some shots of the Innovation Campus work. First, the controversial Industrial Arts Building, which was originally slated for demolition but which is now being refurbished after preservation groups worked with the University. Are you sure that isn't considered "demolition"? There's hardly anything left. Quote Link to comment
Lyons in the Sea of Red. Posted July 11, 2013 Share Posted July 11, 2013 Here are some shots of the Innovation Campus work. First, the controversial Industrial Arts Building, which was originally slated for demolition but which is now being refurbished after preservation groups worked with the University. Are you sure that isn't considered "demolition"? There's hardly anything left. I was just going to come here to mention this. When I was driving by yesterday, there is seriously nothing left of that building but the exterior brick walls. It seems like it would cost more to use rather than just tearing them down. Quote Link to comment
knapplc Posted July 11, 2013 Author Share Posted July 11, 2013 Here are some shots of the Innovation Campus work. First, the controversial Industrial Arts Building, which was originally slated for demolition but which is now being refurbished after preservation groups worked with the University. Are you sure that isn't considered "demolition"? There's hardly anything left. I was just going to come here to mention this. When I was driving by yesterday, there is seriously nothing left of that building but the exterior brick walls. It seems like it would cost more to use rather than just tearing them down. At its best the IAB was nothing more than a shell, anyway. It was a trapezoid-shaped building with a main floor containing a large, open area surrounded by a few offshoot rooms, with a second-floor balcony above overlooking the open main floor below. The balcony was quite wide, but overall it was a weird-shaped place. So for renovation there wasn't ever much they were going to be able to save of the original structure aside from the outer wall. Mostly the renovation was done to appease the "Save the IAB!!!" crowd. It wasn't necessary, and a purpose-built structure would have served the needs of the university better, but they got it declared a Historic Landmark (or whatever) and saved it from the wrecking ball. Here's a decent shot of the old fairgrounds, showing how oddly-shaped this building is. And here's a link to the "Friends of the IAB" Facebook page with tons of pics of the demolition/renovation. LINK Quote Link to comment
Lyons in the Sea of Red. Posted July 11, 2013 Share Posted July 11, 2013 Here are some shots of the Innovation Campus work. First, the controversial Industrial Arts Building, which was originally slated for demolition but which is now being refurbished after preservation groups worked with the University. Are you sure that isn't considered "demolition"? There's hardly anything left. I was just going to come here to mention this. When I was driving by yesterday, there is seriously nothing left of that building but the exterior brick walls. It seems like it would cost more to use rather than just tearing them down. At its best the IAB was nothing more than a shell, anyway. It was a trapezoid-shaped building with a main floor containing a large, open area surrounded by a few offshoot rooms, with a second-floor balcony above overlooking the open main floor below. The balcony was quite wide, but overall it was a weird-shaped place. So for renovation there wasn't ever much they were going to be able to save of the original structure aside from the outer wall. Mostly the renovation was done to appease the "Save the IAB!!!" crowd. It wasn't necessary, and a purpose-built structure would have served the needs of the university better, but they got it declared a Historic Landmark (or whatever) and saved it from the wrecking ball. Here's a decent shot of the old fairgrounds, showing how oddly-shaped this building is. And here's a link to the "Friends of the IAB" Facebook page with tons of pics of the demolition/renovation. LINK That page is somewhat ridiculous. There are some radicals on there. Any idea why there is such an attachment to that building? Seems a little absurd. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.